Showing posts with label shawl. Show all posts
Showing posts with label shawl. Show all posts

Saturday, February 13, 2016

Side Projects Part 2: Knitting

Many moons ago (is that nights or months? I never figured that one out) I splurged and purchased the utterly rad steampunk/post-apocalyptic knitwear collection Doomsday Knits. I drooled over every page, and then finally settled on the Fennec shrug for my first project. I loaded up on Cotlin DK in Linen and Brown Sugar and got to work. I had to adjust my math on the fly to account for a slightly loose gauge and my own measurements, but knitting the main body, hood, and sleeve trim was a breeze. Even the seaming was straightforward and quick.

Then I got to the front trim/band thing. I hadn't realized at first that the band was only longer than the shrug on one side. Sometimes I can deal with asymmetry, but a long tie that I can't even TIE? What is this madness?! I knew it would drive me crazy, and the only sensible solution seemed to be making it long on both sides so that I could cross them, wrap them around my body, and tie them again the front. I somehow arrived at a length of 11 feet for this purpose, and cast on a whopping 594 stitches. It took me weeks just to knit this narrow band.

This is where a picture of that monstrosity being blocked would go, if I could find it!

Even after it had blocked, it was just so heavy that it would hang curled into a dense, heavy rope when draped over me. I held out (completely unrealistic) hope and started attaching it to the hood, but it was obviously no good. The weight of it was making it at least an extra foot longer, and it was just so heavy and unwieldy that I was unpleasantly reminded of trying to tie on a Moby wrap.

Frustrated, I shoved it in a box and ignored it for an entire year.

I probably would have gone on ignoring it, except that I spotted the box taking up room in my closet and couldn't honestly remember what was in it. I pulled it down and was suddenly convinced that I could fix it!

Step 1: Rip off and frog the entire 11 foot band. No hesitating. Just do it.

Step 2: Soak the rest of the shrug and throw it in the dryer on high heat to see if you can get it to shrink at all because even with all my mathing, it was still roomier than I'd like.

Step 3: Reknit the band to have NO TIES AT ALL. Only make it long enough to be decorative trim.

Step 4: Shrink and seam that sucker, and wear it with pride!

I'm happy to say that all steps were followed with success. I even wound up putting a small button right at the neckline to hold it closed. While it's still kind of a weird sweater that I won't wear super often, I'm glad I rescued it! And I got compliments!

Forgive my derpy expression. I was trying to look like a cool magazine model. I'm a terrible model. >_<
In fact, the first time I wore it was the to the first Shawl Ministry meeting I attended - Part Two of my knitting side project story! A much shorter part. I signed up for the UUCCWC Shawl Ministry, I showed up the first Saturday in February with yarn, tools, and brownies. Everyone was happy to see me, I had a lovely time, and I cast on for a purple lace shawl that will be added to the stash of scarves and shawls donated to those in need of comfort. Next month we're all going on the Rose City Yarn Crawl together! Wooooo yarn nerdery!

Sunday, November 29, 2009

Blocking the Shawl

IT'S DONE!!! Had to learn the "Russian Lace Bind Off." I don't know if I am ever knitting a lace shawl ever again. That's all I have to say about that right now.




Thursday, November 19, 2009

Perseverance

I'm down to just a little over four weeks. That might seem like plenty, but I'm not even half way done with this shawl. As the rows get longer, it just takes so long to do even one. And I'm pushing really hard to get it done ASAP because I have other projects that I'd like to get done before Christmas.


So, I'm working on it for HOURS every night, and I feel kind of guilty taking breaks to blog about it.

Guess I should keep this short, and get back to work.

Tuesday, November 10, 2009

Lacy Frustrations


I nearly had a complete meltdown yesterday evening. There were tears; there was muffled screaming; there were unforgivable thoughts of knitticide. (o)ribbit(o)

I've been working on a lace shawl. I know there are people who whip these things up regularly and never think twice about it, but I've never done anything even remotely so complex and difficult, and I'm having a hell of a time with it. The most frustrating part is that the stitches are NOT EVEN difficult. Yarn-overs, k2tog's and ssk's, with the occasional s1k2togpsso thrown in for neatness. Nothing I can't handle. I can even read charts with zero confusion. Heck, I make my own charts!

So what's the problem?

Honestly, I don't know if it's simply a concentration issue or what, but I keep making very simple mistakes - usually it's forgetting a yarn-over - and then I don't notice it until two rows later when I suddenly realize I don't have the correct number of stitches to finish this new row of the chart. Since my lifeline is usually several rows below that, I wind up carefully tinking back, one stitch at a time, down two whole rows, which at this point are just over 100 stitches each. I'm making more progress backward than forward. And so, this shawl that I gave myself seven weeks to make (now six), is perhaps only 10% done.

The only reason I'm even sticking with it is that I told my mom I'd make something fabulous and periodish for this Victorian Holiday Party she and my stepdad have been invited to, and to which they're bringing me. The guests at this party are encouraged to present some sort of performance - a song, a reading, a dramatic interpretation, or, as in my case, a brief talk on a craft or hobby, the accompanying display being, of course, this goddamn shawl. I said I would do it, I want everyone to admire it, so dammit, I'm going to make this farking thing and I'm going to make it on time.

Stubborn pride can be an excellent motivator.